- manufacturer
- Huta Zabrze
- Type
- EAF
- Manufacture Date
- 1976
- Description
- included:
- Furnace hydraulic systems
- Lance manipulator
- Furnace construction design
- Hearth furnace
- Electrode control
Batch weight 25 t
Melting time tap to tap 80 - 90 min.
Graphite electrodes 3
Diameter of electrodes 350 mm
Electrode clamps St/Cu water-cooled
Furnace hydraulic systems
Furnace tilting cylinder
Electrode lifting cylinder
Year of manufacturing 2006
Pumps axial piston pumps
Valves proportional servo valves
Lance manipulator
Manufacturer Huta Ostrowice
Year of manufacturing 2006
Alloying additives carbon and O2 with lance blowers
Carbon automatic storage bin system
In 2006, the following components were renewed:
Furnace lid, water cooling system 1st jacket ring, water cooling system Furnace bend, water cooling system Installation of a new furnace transformer. The disassembled transformer is available for sale Furnace hydraulic system Lance manipulator Melting rate control, Siemens S7-300 - by order of:
- NetBid Polska
*** ended *** Huta Zabrze EAF Electric arc furnace
PreviousAuction Type
Trading Premium- ends:
- 11/02/2020
15:00 - number of bids:
- 1 Gebot
- Status:
- Sold
- Item no.:
- X14223-1
- surcharge
- 0.00%
Electric arc furnace
Item no.: X14223-1
login
You must be logged in to use this functionality.
It is not possible to bid on this machine at this moment
* Bids and limits plus commission and vat
There will be no delivery. Assets are sold as is/where is. For your calculation please keep in mind the additional cost for removal, transportation, insurance and so on.
* Bids over € 5.000 are accepted with Bank Certificate (this also applies to further auctions).
-
Details Electric arc furnace
-
Contact
NetBid Polska T (48) 22 636 02 70 (Englisch Speaking), Email: pl@netbid.com
-
Conditions
All acceptances of bids in this auction are with reservation. The final approval of the offer takes place after its acceptance by the Seller (owner).
The Bidder who has received the acceptance with reservation will be bound up with his offer within 7 days.