- Producto
- Voestalpine
- Modelo
- R 500/4
- Año de construcción
- 1976
- Descripción
- Direction of the operational phase from the engineer’s point of view: from left to right, Height of the bottom pipe edge: approx. 900 mm, Strip width: min. 100 mm, max. 500 mm, Strip thickness: min. 1.5, max. 5 mm, Material: Hot and cold rolled strip with the max. tensile strength 500N/mm2, Spool outer diameter: max. 1.450 mm, Spool inner diameter: 500 mm – 600 mm, Pipe length: 4 to 8 m, Cut tolerance: +/- 15 mm, Line speed: max. 80 m/min (non-sequentially adjustable), Strip installation speed: 10 m/min. (forward/backwards), Round pipe diameter: min. 38 mm, max. 152 mm, Pipe wall thickness: min. 1,5 mm; max. 5 mm, Pipe wall thickness and pipe diameter ratio: from 1:8 to 1:40, Square pipes: min. 35 x 35 mm, max. 120 x 120 mm, Rectangular pipes: min. 40 x 20 mm, max. 120 x 80 mm, Width-height ratio: max. 1:2,5, Construction profiles GP: L 34 x 35 x15 x 2, T 34 x 35 x15 x 2, Tk 34 x 35 x 15 x 2, Zk 34 x 35 x 15 x 2, L 50 x 30 x 15 x 2, T 50 x 30 x 15 x 2, L 80 x 40 x 18 x 2, L 100 x 40 x 18 x 2.5
Console crane to load the strip roller into the loading container (crane load capacity 3,200 kg); Lift table with the roller reservoir; Unwinder with the option of transversal shift; Blade with the pressing roller; Levelling part with two drive rollers and six levelling rollers; Strip preparation with transverse shears for strip end cutting and automatic strip welding (gas exhaustion); Rack with two drive and lateral rollers; Two winding rollers (one for strip winding); Rack with two drive and lateral rollers; Transversal shears for belt end cutting; Welding section for strip welding after the turning of the wind drum; Profiling section (12 main and 11 intermediary racks); BLISSENBACH weld imitation, year of production 2005; Welding part with a pre-welding and welding console and cogwheels; HF-Generator Thermatool of 300 kW, semiconducting, year of production 2002 (smoke gas exhaustion); Support with weld imitation blade; Cooling sump replaced in 2002. Manufacturer VOEST-ALPINE, Austria; Calibrating section (5 main and 3 intermediary racks); FOERSTER weld control, year of installation 2004, Turk heads, electric installation in 2002. Manufacturer VOEST-ALPINE, Austria; Flying saw, new flying saw, hot and cold cut, in 2003. Manufacturer VAI-SEUTHE, Germany; End roller with a buffer; MAIR piling device with scales, year of installation 2002, Manufacturer: MAIR, Italy; Transporter of pipe bindings to the warehouse. The minor programme replacement on the line lasts 4.5 h, while the major programme replacement takes up to 10.5 h.
ATTENTION: The final approval of the offer takes place exclusively after the approval of the insolvency administration. - Orden de venta:
- NetBid GmbH (Austria)
*** Terminada *** Voestalpine R 500/4 continuous pipe production line
AtrásFormatos Oferta
Auction Premium- Cierre:
- 15/01/2015
14:08 - Ofertas existentes:
- 2 Pujas
- Estado
- subasta cerrada
- Número de oferta:
- X13251-9
- Comisión
- 8,00%
continuous pipe production line
Número de oferta: X13251-9
Login
Usted debe haber iniciado la sesión para poder ultilizar esta función.
Ya no se puede pujar por este lote.
* La puja y el limite se consideran mas comision e IVA.
No se realiza ninguna entrega. En su cálculo, por favor, considere los gastos adicionales para el desmantelamiento, transporte, seguro, etc.
* La Pujas superiores a € 5.000 se aceptarán tan solo cuando se acompañen de un Certificado Bancario (que será aplicable a futuras subastas).
-
Detalles continuous pipe production line