- Descripción
- Direction of the operational phase from the engineer’s point of view: from right to left, Height of the bottom pipe edge: approx. 900 mm, Strip width: min. 50 mm, max. 250 mm, Strip thickness: min. 1,5, max. 3 mm, Material: Hot and cold rolled strip with the max. tensile strength 500N/mm2, Spool outer diameter: max. 2,000 mm, Spool inner diameter: 500 mm – 600 mm, Pipe length: 4 to 8 m, Cut tolerance: +/- 15 mm, Line speed: max. 80 m/min (non-sequentially adjustable), Strip installation speed: 10 m/min forward/backwards), Round pipe diameter: min. 17,2 mm; max. 44,5 mm, Pipe wall thickness: min. 1,5 mm; max. 3 mm, Pipe wall thickness and pipe diameter ratio: From 1:8 to 1:40, Square pipes: min. 15 x 15 mm, max. 35 x 35 mm, Rectangular pipes: min. 25 x 15 mm, max. 50 x 20 mm, Width-height ratio: max. 1:2,5
R250/3 line assemblies and updates: Console crane to load the strip spools on the unwinding spine(crane load capacity: 3,000 kg); The unwinder replaced in 2005, the VAI SEUTHE Company, Germany; Levelling part with two drive rollers and five levelling rollers; Strip preparation with transversal shears for strip end cutting and automatic strip welding (gas exhaustion); Rack with two drive and lateral rollers; Two winding drums (one for strip winding), installation of winding drums in 1992; Rack with two drive rollers; Lever shears for strip end cutting; Welding section for strip welding after the turning of the winding drum; Profiling section (9 main and 8 intermediary racks); Welding part with a pre-welding and welding console and cogwheels; HF-Generator Thermatool of 200 kW; emiconducting, year of production 2003 (smoke gas exhaustion); Support with weld imitation blade; Intermediary rack, Cooling sump, Calibrating section (5 main and 3 intermediary racks); FOERSTER weld control, year of installation 2004; Turk heads; Flying saw, reprocessing of the existing cold cut flying saw and its new electrical control in 2009. Manufacturer: ETRA and maintenance of the Pipe factory; End roller with a buffer; MAIR piling device with scales, year of installation 2002, Manufacturer: MAIR, Italy; Transporter of pipe bindings to the warehouse. The minor programme replacement on the line lasts 4.5 h, while the major programme replacement takes 10.5 h
ATTENTION: The final approval of the offer takes place exclusively after the approval of the insolvency administration. - Orden de venta:
- NetBid GmbH (Austria)
*** Terminada *** Voestalpine R 250/3 continuous pipe production line
AtrásFormatos Oferta
Auction Premium- Cierre:
- 15/01/2015
14:10 - Ofertas existentes:
- 2 Pujas
- Estado
- subasta cerrada
- Número de oferta:
- X13251-11
- Comisión
- 8,00%
continuous pipe production line
Número de oferta: X13251-11
Login
Usted debe haber iniciado la sesión para poder ultilizar esta función.
Ya no se puede pujar por este lote.
* La puja y el limite se consideran mas comision e IVA.
No se realiza ninguna entrega. En su cálculo, por favor, considere los gastos adicionales para el desmantelamiento, transporte, seguro, etc.
* La Pujas superiores a € 5.000 se aceptarán tan solo cuando se acompañen de un Certificado Bancario (que será aplicable a futuras subastas).
-
Detalles continuous pipe production line