- Producent
- Voestalpine
- Model
- R 250/3
- Rok prod.
- 1976
- Opis
- Direction of the operational phase from the engineer’s point of view: from right to left, Height of the bottom pipe edge: approx. 900 mm, Strip width: min. 50 mm, max. 250 mm, Strip thickness: min. 1,5, max. 3 mm, Material: Hot and cold rolled strip with the max. tensile strength 500N/mm2, Spool outer diameter: max. 2,000 mm, Spool inner diameter: 500 mm – 600 mm, Pipe length: 4 to 8 m, Cut tolerance: +/- 15 mm, Line speed: max. 80 m/min (non-sequentially adjustable), Strip installation speed: 10 m/min forward/backwards), Round pipe diameter: min. 17,2 mm; max. 44,5 mm, Pipe wall thickness: min. 1,5 mm; max. 3 mm, Pipe wall thickness and pipe diameter ratio: From 1:8 to 1:40, Square pipes: min. 15 x 15 mm, max. 35 x 35 mm, Rectangular pipes: min. 25 x 15 mm, max. 50 x 20 mm, Width-height ratio: max. 1:2,5
R250/3 line assemblies and updates: Console crane to load the strip spools on the unwinding spine(crane load capacity: 3,000 kg); The unwinder replaced in 2005, the VAI SEUTHE Company, Germany; Levelling part with two drive rollers and five levelling rollers; Strip preparation with transversal shears for strip end cutting and automatic strip welding (gas exhaustion); Rack with two drive and lateral rollers; Two winding drums (one for strip winding), installation of winding drums in 1992; Rack with two drive rollers; Lever shears for strip end cutting; Welding section for strip welding after the turning of the winding drum; Profiling section (9 main and 8 intermediary racks); Welding part with a pre-welding and welding console and cogwheels; HF-Generator Thermatool of 200 kW; emiconducting, year of production 2003 (smoke gas exhaustion); Support with weld imitation blade; Intermediary rack, Cooling sump, Calibrating section (5 main and 3 intermediary racks); FOERSTER weld control, year of installation 2004; Turk heads; Flying saw, reprocessing of the existing cold cut flying saw and its new electrical control in 2009. Manufacturer: ETRA and maintenance of the Pipe factory; End roller with a buffer; MAIR piling device with scales, year of installation 2002, Manufacturer: MAIR, Italy; Transporter of pipe bindings to the warehouse. The minor programme replacement on the line lasts 4.5 h, while the major programme replacement takes 10.5 h
ATTENTION: The final approval of the offer takes place exclusively after the approval of the insolvency administration. - Zlecenie:
- NetBid GmbH (Austria)
*** Skończone *** Voestalpine R 250/3 continuous pipe production line
WsteczTyp oferty
Auction Premium- Koniec aukcji:
- 15.01.2015
14:10 - Liczba ofert:
- 2 Oferty
- Status:
- Aukcja zakończona
- Numer oferty:
- X13251-11
- Prowizja
- 8,00%
continuous pipe production line
Numer oferty: X13251-11
Zaloguj się
Zanim oddasz ofertę musisz się zalogować.
It is not possible to bid on this machine at this moment
* Oferta i limit będą powiększone o prowizję i podatek.
Oferta nie zawiera kosztów dostawy. W twojej kalkulacji dolicz dodatkowe koszty demontażu, transportu, ubezpieczenia, itp.
Oferty od 5.000 EUR wymagają potwierdzenia bankowego (dotyczy to również innych aukcji).
-
Szczegóły continuous pipe production line